Rahim Yar Khan Airport
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
Rahim Yar Khan, Punjab
Start Date:
1988
Completion Date:
1990

Project Description

Rahimyar Khan Airport consisted of following facilities:

  1. Passenger Terminal building (by CAA)

  2. VVIP Lounge

  3. Main Runway (2743 m x 30 m) for Boeing 737 operation - flexible pavement

  4. Central taxiway (306 m x 23 m) - Rigid pavement

  5. Parking apron - 160 m x 90 m - Rigid pavement

  6. Runway lighting system

  • Simple approach lighting system

  • Runway edge lights

  • Threshold and runway and light

  • Papi light

Rahimyar Khan Airport was funded by His Highness Sheikh Zayed Bin Sultan Al-Nahyan, President of United Arab Estate (UAE).

 

Services

  • Field investigations and topo survey

  • Detailed design & drawings

  • BOQ, specification & tender documents

  • Pre-bid services

  • Construction Supervision