Additional Work of Bridges and Inlets under Karachi Special Development Programme
BACK TO PROJECTS

Name of associated firm :
M/s. Balfours, U.K
Project Location within Country:
Karachi
Start Date:
March 1990
Completion Date:
1994

Project Description

The  outfall of Pir Bukhari Nalla, bridge needs to be constructed to connect the right bund of Malir River and make it accessible during flood season. Similarly, at outfall of Chakora Nalla, bridge is required to be constructed to connect the right bund of the Malir River to make it accessible during flood season.

An area encroached by Karachi-Korangi Road, left bund of Malir River and Korangi Nalla called as Bhitai Colony is not having any drainage facility. During rainy seasons, the water collects in this area being low-laying so drainage facilities are provided for this area.